Petroleum

Ops.com

                 

Legacy

Photos

            

   

 

< Petro Ops

 

   

PL Project

High Tech

Tank Rebuild

Legacy

  

 

  PETROLEUM OPS

 

Legacy

 

Images of petroleum terminal assets

taken during construction older projects during

my career in the petroleum industry.

 

If there was more time and space, there are

some fascinating stories behind many

of the images.

 

   

 

   TRUCK RACK

There is no

better

operation

than a

properly

functioning

truck

loading

rack.

 

   

6 hose,

three

component

sequential

blending

truck

lane.

 

 

   MANIFOLD

10 tank

truck

rack

manifold

 

 

   VESSELS

Hosing

operation

set up.

 

   

20,000

MT

chemical

tanker

arriving

at dock.

 

 

   TRANSPORTATION

36" HDD

   

Thermal

Destruction

of  vessel

vapors

 

   

Unloading

Rack

for Crude

Oil Unit

train

 

   

Berth 46

 

 

 08/28/06